How do I insert meters values?
The meters can be loaded through individual records, in batch or by importing .csv files.
Meter values can be
introduced in two ways:
- Value
Increase: Difference between the current reading and the previous reading. It is used in Increment-type meters and allows you to
enter the zero value;
- Meter Reading: current meter reading. It is used in Read-type meters.
The following rules
must be observed when entering meter values:
- The inserted value in the Increment Value or in the Meter Reading can never be superior than the Maximum Value introduced on the meter;
- The meter reading will automatically restart when the maximum value is reached;
- You cannot record readings for the same meter and asset with the same
second;
- When a meter value is deleted, all values for the same meter with a greater date will be updated to ensure conformity. The cumulative reading and the average will be recalculated.
To insert a new meter
reading, follow these steps:
- Go to Assets |
Measurements | Meters or Monitorings;
- Click on the Operations
button to access the meter values list;
- On the meter
values page, click on Create;
- Fill in the meter
value data;
- Click on Save
and New.
Related Articles
How do I insert a replacement meter?
To insert a replacement meter, follow these steps: Go to Assets | Measurements | Meters; Select a meter; Click on the Operations button to access the meter readings list; Click on Create and then on Replace Meter; Fill in the replacement meter ...
How do I insert monitoring values?
The Valuekeep monitorings can be fed information from individual records or through batch records by importing .csv files. To insert a new monitoring reading select the option Assets | Meters and Monitorings | Monitorings: A monitoring list is ...
Criteria for Preventive Maintenance with meters
When you create a preventive maintenance with meters and the configured meter in the maintenance plan has meter readings, when you approve the preventive maintenance and generate the events the commutative meter reading in the event starts at the ...
How do I create meters?
The meters are system entities which allow for monitoring parameters of the assets operation in order to trigger Preventive Maintenance actions. The meters can operate as autonomous units or have other meters associated with it. To create a new ...
How to report meter values associated with the work order?
Every time the Work Order state is configured to allow to record work, it will be possible to associate meter reading to the work order, if the work order asset has associated meters. To record meter readings for the Work Order select the option Work ...