How to change the state transition dates of a work order?

How to change the state transition dates of a work order?

The state transition dates can be changed, for that  select the option Work | Work Orders
  1. The work orders list is presented
  2. Select the work order that wish to change the state
  3. On the "Operations" link, select the option "Change State Transitions"
When changing the state transition dates, you must consider that:
  1. Changing the state transition dates affects the SLA start and end dates;
  2. The state transition dates must be later than the Work Order date;
  3. The state transition dates must be equal or previous than the current date;
  4. The chronological order of the state transition dates must be respected;
  5. The Requests connected to the Work Order must consider:
    1. The state transition dates of the Request will be changed according to the Work Orders Workflow;
    2. The SLA start and end dates of the Request will be changed according to the Work Orders Workflow configuration;


    • Related Articles

    • How to change the state transition dates of a request?

      The state transition dates can be changed, for that select the option Work | Work | Request Management The request list is presented Select the request you wish to change the state to On the "Operations" link, select the option "Change State ...
    • How do I manage batch work orders?

      Work Order (WO) management was designed to increase the maintenance manager productivity. Thus, with this feature, the manager is now able to: change the state of several WOs simultaneously; print several WOs simultaneously; To manage WOs in batch, ...
    • How to report downtime associated with the work order?

      An asset, location, equipment or tool can be unavailable for a period of time. To report down time associated to a work order, you must execute the following steps: Access the option  "Work | Work Orders"; Edit the desired Work Order using the ...
    • How to consult the history of a Work Order's state transition?

      A work order is created in the initial status and until it is finalised it passes through different statuses. With the profiles Administrator and Maintenance Manager, you can see the list of all statuses through which the work order passed. To check ...
    • How to create a work order?

      The Work Order (WO) is the entity that represents the maintenance job to be performed and which asset, location or route it refers to. To create a new Work Order, select the option "Work | Work Orders"; The list of work orders will be displayed; ...